Type: Health

  • Health Department Headquarters

    Health Department Headquarters

    The new Basque Health Department headquarters is
    located at the last site that still remained unbuilt on the
    administrative and Business Center of Bilbao. Up to now,
    the institution was suffering the spread of its staff in several
    buildings, hardly recognizable by citizens, away from each
    other and uncomfortable for both users and technical
    services. The project at the same time involves both economic and property profits.

    The aim of the new building is bringing together
    staff in a recognizable place, in order to increase the
    efficiency of the service and identify easily the corporation.

    The site is located in the crossroad of two important streets
    of the Ensanche, designed in 1862. The restrictive city rules
    compel to repeat the shape of the neighboring walls,
    reducing penthouses according to a curved directive,
    chamfering the corner and building a tower on it.

    The folded façade generates multiple visual directions from
    inside to the streets bellow, and also from the highest floors
    to the landscape that surrounds the city, a highly effective
    mechanism for the incorporation of urban vitality inside the
    building.

    The double façade solves not only all the mentioned urban
    requirements but also those concerning energetic, fireresistant
    and acoustic insulation. This climatic improvement
    enables the elimination of the conventional air-conditioning
    installation as well as the false ceiling. Thus, the sound
    produced by the building is reduced, air recirculation in
    workplaces disappears, with a significant increase of health
    conditions, and the volume occupied per floor is also
    reduced, saving resources consumed by the construction.

    The façade responds to the investigation launched in the
    previous projects, which considers the wrapper as a
    system. The construction techniques, the operation of the
    building, the energy exchange, the city and also the very
    fact, the desire to be… take part in the system definition, but
    never the elevation or the composition. The system must
    provide a valid response to the different situations
    generated in the façade. Instead of merely set the building
    on the one hand and shaping the urban space on the other,
    the façade system should become a social vehicle.

    The building concentrates services and communications in
    a vertical spine attached to the longest party hedge and
    generates seven open floors assigned for offices. Above
    this, there are two floors for local representative and
    institutional use. The workspace benefits of the permeable,
    passable and livable volume of the building. The board hall
    takes up the double height of the tower. The auditorium, its
    foyer and its appendages are situated in the first basement.
    Further below there are two parking floors and one fourth
    level for archives. The car lifts allow access to all the
    basement levels.

    The project emphasizes the place to sit on the threshold, at
    the doorway of a house, looking down the road and the
    back into the home.